The replacement of the existing roof membrane assemblies with a new multi-ply modified bitumen roofing membrane system, new flashing, brickwork, and the installation of new railing…
Facade repairs as per plans filed herewith. No change to use, egress or occupancy.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under thi…
Construction permit
Repair of sidewalk vault
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of pipe scaffolding and heavy duty sidewalk shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupanc…