Selective Removals and Replacement of Existing Flooring, Cabinetry, Entry Doors, Hardware, Painting, New Chase Wall (1st Fl - 4th Fl), Ceramic Tail Wainscot. New Plant Shelving - A…
Fn/ps5k - for temporary construction equipment(fence) submitting on behalf of contractor, related to job b00905831. no change in use, occupancy or egress
K005-replacement of windows. new louvers, new plaster & paint & new vct flooring where indicated.
Installation of construction fence to protect public from work areas.
Sf/ps5k - for temporary construction equipment(scaffold) submitting on behalf of contractor, related to job b00905831. no change in use, occupancy or egress
K005-install new structural steel framing to support new mechanical louver & new windows.
Remove and replace classroom entrance door, vct flooring, window shades, signage, and classroom finishes.
General construction work related to mechanical work for hydroponics lab.
Mechanical work related to a hydroponics lab.
Install new (1)-20x6 top exhaust register and clean associated duct connection. provided with new volume damper for each register and fire damper on penetration thru the fire rated…
K078-Replace/discard existing door (Rm147/143); Replace Metal Partition Walls/Replace Non ADA Doors/Metal Studs/w ADA Wood Doors and Frames; Remove Built-In; Patch/Prime/Paint; Ins…
Selective demo/removal of: 6-Existing Grilles/2-Radiators/Steam supply/Condensate return riser. Install sheet-metal/6-exhaust/2-convectors/new steam/condensate piping/runout from e…
Provide steel dunnage for Generator at roof top. Provide slab openings to accommodate ductwork. Provide shaft for oil piping at stair # 1.
Sf/ps452m - for temporary construction equipment (scaffold) submitting on behalf of contractor, related job number # m08034415 no change in use,occupancy or egress
Fn/ps452m - for temporary construction equipment (fence) submitting on behalf of contractor, related job number # m08034415 no change in use,occupancy or egress
Fn/ps194k for temporary construction equipment(emergency fence) submitting on behalf of contractor, in conjunction with llw# 126670 no change in use, occupancy or egress
Fn/bx theater hs - for temporary construction equipment(fence) submitting on behalf of contractor related with dob#m01229093 no change in use, occupancy or egress
Interior removals on the 3rd floor. New interior partitions, ceilings, doors, floor finishes, handrails and ramp at exit 9
Provide mechanical exhaust for all classrooms, install new rooftop exhaust fans, split system ac units and related ductwork and piping.