Suite 110. Interior remodel to existing business suites. This project is phased by suite numbers and this permit is for suite 110 only. No access cont
Replacement of complete existing central heat and air system with or without duct work
INTERIOR REMODEL - PHASED PROJECT - PHASE 1 Includes all of level 3 all of level 2 and the admin half of level 1. This will get the family kitchen on
Add HVAC to office/warehouse tenant space.
**emergency gas permit needed- rosadale aparts- locked out gas meter- possible gas leak- unit 251 or 151** need perform pressure test on the main line
Ground up construction of an athletics center building (gymnasium) with concession stand SP-2025-0165C.CC - Concurrent Reviews
Replacing two existing buildings I & K (via 2025-114723 PR) with one new modular building.
Replacement of an existing water heater APT # 511
Replacement of an existing water heater APT # 715
7 day - tenant finish out to create office space - expansion - no access control - different scope of work than 2025-153249 pr - ova
All the horizontal cast iron piping under the home was replaced with PVC pier and beam access under the home.
CHANGE OF USE OFFICE TO PRIMARY EDUCATION Interior renovation of approx 43830 SF of an existing 3 story 66360 SF office bldg to accommodate a private
Phase 2 for TCO-L1: Courtyard & Elevator Lobby renovation + L2: Resd unit construction + L3 Clubhouse & Deck Renovation: total renovation sqft (7301) + total new construction sqft…
PHASE 3 for TCO - Corridor enclosure renovation (L1) music & corridor renovation (L2) lounge renovation (L3): 3167 renovasion sqft; new common area ex
**add of a sink backside of restroom; includes plaster trap**
PHASE 4 for TCO-L1: IL unit expansion & bridge courtyard & garage renovations + L2: IL unit expansion & bridge Chapel & Fitness renovation + L3: IL Unit expansion and bridge 6605 t…
PHASE 3 for TCO existing generator & SW courtyard renovation (L1) corridor enclosure renovation (L1) music & corridor renovation (L2) lounge renovation (L3): 12158 renovation sq ft…
Rework existing mechanical units on level 2. Add additional louver to the area to server 3 new intake fans. Work is in exterior room no Asbestos. Work is in non occupied mechanical…
Replacement of an existing water heater **WATER HEATER REPL- LIKE FOR LIKE** UNIT # 1206
ePlan: Commercial Expedited Review - [CONCURRENT] Change of Use and Finish Out for Theater and Dance School in Space Previously Retuned to Shell in Phase I scope includes New Exter…