168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Mechanical trade Permit
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
No structural work/alteration. this project requests a fast track fitout (ft-oo) permit review. project scope: partial floor interior renovation of a previously occupied tenant sui…
22 feet width units B2601217, B2601512, B2601514, B2601513 The District of Columbia Mechanical Code is currently in the 2017 cycle, which does not have the A2L refrigerant requirem…
26 fee units B2601216, B2601517, B2601528, B2601525, B2601515, B2601516, B2601518, B2601521, B2601522, B2601523, B2601524, B2601526 The District of Columbia Mechanical Code is curr…
The installation of a 4 Head Mini split HVAC system: 36K BTU ODU and four 9K BTU IDU
In Chinatown Interior renovation of the existing restaurant for the new owner. All HVAC system, kitchen hoods and cooking equipment are existing to remain. New restrooms, new servi…
Mechanical trade Permit
Historic District CFA Social Supply Event Center - Tenant Layout to approximately 12,129 SF of existing base building with an ADDITION of approximately 4,582 sf ENCLOSED SPACE and…
First time fitout for a tenant space at the 6th floor. scope includes new partitions/doors, finishes, ceilings, electrical, mechanical, and structural for an operable partition. wo…
Subtitle 12-E DCMR, mechanical code supplement of 2021, is amended as follows: IMC - 2021 Article 1109.3.2 Refrigerant pipes shafts using group "A2L" or "B2L" refrigerant shall be…
Mechanical trade Permit