168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Replace Power unit with Submersible Power Unit. Install a Rupture Valve in Pit
Scope of revisions constitutes a partial plan revision to the previously approved permit set issued under permit no. b2405001 and include; modifications to interior layout revision…
In Chinatown Modernization of one elevator (#7)
In Chinatown Modernization of one elevator (#4)
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Install security CCTV system for existing tenant on floor 1
Installation of 1 Triple Sump Pump, 36 LNFT Drain Tile, and 36 LNFT Basement Gutter.
Site of Schlitz Brewing Co Depot/National Geographic Society Warehouse Phase 1 1st Floor Partial interior build out. Interior renovation of Advanced Technical Center (ATC). Busines…
HISTORIC & CFA Project consists of tenant fitout/interior renovation to one suite of an existing office building with no proposed change to Zoning or Building Code Use.
Interior revisions to b2603290, 8th floor office renovation, to show changes to suite b layout. will now have 50 occupants. additional updates to door and finish schedules, mep and…
Revise permit f2600162 to add 12lnft of additional fence w/gates
Repair front porch, including front step, brick, and post