168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
The renovation of the existing bar, private dining room, and restaurant. the renovation includes the reconstruction of the bar in the diner bar with existing and new equipment. the…
Selective demolition. replace in kind kitchen and bathroom fixtures. new drywall as required. modifications to electrical and mechanical systems
Demolition of select existing conditions, including structural, mechanical, electrical, plumbing, life safety, and fire alarm systems on multiple floors, in preparation for a new b…
Selective demolition. re-configure existing kitchen.replace in kind bathroom fixtures.new framing as required. modifications to electrical and mechanical systems
This permit will be an addendum to permit #B2508148. Interior renovation of existing lower level office space and level 1-3 retail spaces. Scope of work include demolition, archite…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
In the capitol hill historic district revision to permit : sh2500033. support of excavation system consisting of soldier piles and lagging to facilitate demolition of the existing…
3 Story brick multi-family.
3 Story brick multi-family.
interior demo of existing kitchen, primary bathroom and primary closet
Demolition of existing vacant space turning it into two shell suites.
In the Dupont Circle Historic District Non structural demolition of interior trim, doors, and finishes.
Interior demolition to 5th floor office space. no structural demo. rework electrical lighting and life safety systems to leave space as a warm shell. no occupancy under this permit…
Demo back porch
Work scope: the scope of work for these demolition drawings involves selective demolition of an existing building for a future interior renovation limited to ground level (p1) and…
INTERIOR REMODEL / NEW KITCHEN- NEW POWDER ROOM AND NEW FULL BATH. ZONING APPROVAL is subject to the following CONDITIONS: - NO REAR DECK: No work has been proposed to reconstruct…
Removing cabinets and old appliances in kitchen. Removing ceramic tile and vanities, toilet and shower fixtures in bathrooms
The 700 6th Street permit includes demolition of a portion of the 700 6th Street Buildings exterior fa?ade to accommodate an opening for the pedestrian connector between the Galle…
Demolition of an existing vacant 2nd floor office suite and bifurcating the space into two shell suites; concrete in-fill of an abandoned dumbwaiter shaft; and refurbishing the ele…
Remove exiting deck.
Renovation, revamp and design space for restaurant use. exterior work: 1. paint exterior envelope. finish designated areas with new siding. 2. upgrade entry concrete surfaces and a…