168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
In the Georgetown Historic District There is a historic easement at this location Site of Tenney, Issac House In the Commission of Fine Arts jurisdiction area Interior demolition o…
Scope of work includes alterations to the 5th and 6th floors including selective interior and exterior demolition, interior construction includes new partitions, ceilings, and fini…
Suite 360 Interior Renovations to Existing Office Space. To include selective demolition and new construction - Partition, Mechanical, Electrical, Plumbing, Ceiling, Finishes and L…
Selective demolition. replace in kinid kitchen and bathroom fixtures. new drywall and framing as required. proposed deck and fence. modifications to electrical and mechanical syste…
Demolition of tenant build out on floors 1st through 10th to include architectural components, plumbing, electrical and mechanical equipment. No structural changes to be made.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Interior Tenant Fit Out spanning three floors of an existing mixed-use building. Work includes demolition, structural reinforcement, partitions, doors, windows, ceilings, lighting,…
B1 & 1st floor - interior renovation of the partial first floor to include minor demolition of electrical devices and fixtures. new scope of work includes new electrical devices, f…
Scope of work: reconfiguration of office space by new owner demolition: partial demolition of existing closets, doors, windows and non-load bearing walls in the second floor. demol…
Repair Roof Sections O, M, P - Erect the required ladders as needed in order to access the work areas safely per OSHA guidelines; removal/disconnection of rooftop mechanical equipm…
HISTORIC Basement - Floor tile, HVAC, demolish bathroom (HVAC, plumbing and electrical upgrade), and interior trims demolition.Main Floor - Demolish kitchen and bathroom, HVAC, plu…
The scope of work involves partial interior demolition across all levels of the structure. On the first floor, interior partition walls will be removed to facilitate an open-concep…
Removal of partition walls, interior doors, closets, millwork, cabinets, flooring, appliances... No structural elements will be disturbed. No areas identified as containing lead wi…
Remove existing bay window and replace with a new window in the den. remove existing hardwood flooring. build a new powder room and closet in the den. install new light fixtures in…
Interior Demo Only on 1st Floor.
Interior demolition of non-load bearing elements on the 5th floor for the future Special Delivery Unit.
Interior demolition of non-structural components
Demolition whitebox 8th floor - scope of work includes demolition of existing 8th floor suite including full partitions, ceilings, lighting, finishes, and associated mechanical, el…
Interior demolition of office suites on 6th, 7th, and 8th floors, including partitions, ceilings and associated lighting and HVAC. No structural or exterior demolition.
Interior renovation of existing single-family home to include interior demolition, new window well,windows and door replacement, demolition of attic. roof deck, building new dormer…
Cfa / h partial 7th floor tenant interior demolition of previously improved tenant suite. demolition scope of work to include interior partitions, doors, ceilings, casework, plumbi…