168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Construction Code #1: Appendix G of the 2017 District of Columbia Energy Conservation Code - Commercial Provisions, Section G1.2.2 Performance Rating Calculation (Performance Cost…
We are requesting that, where combustibles are located in unrated concealed spaces, the building be allowed to provide sprinkler coverage In lieu of noncombustible protection. This…
Fit out of existing tenant space on 7th floor to include selective demolition, construction of finishes, mechanical and electrical as indicated. Area affected: 11,126 SF
Modernize One (1) Traction 3000lb/100fpm Passenger Elevator. Install a non-proprietary Pixel Traction Controller. Install new copper wiring, wire ducts, EMT, and all necessary conn…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Web and/or Digital Development/Product/Business Support
We are conducting a Pull/Replace Bathroom renovation on an existing 3rd floor bathroom.
modification to B2603278. Changes to Floor Plans, to included Electrical and Mechanical layout; Replace in kind damaged framing at rear of house.
In the Mount Pleasant Historic District Exterior repairs to front and side of property. Replace damaged drains, gutters, and rotten wood along the front porch ceiling, front and si…
PROJECT NARRATIVE: This application is being submitted to re-permit the project originally approved under B2200539. This project is proposing an addition/alteration to an existing…
Interior renovation of existing lower level office space and level 1-3 retail spaces. Scope of work include demolition, architectural, structural, mechanical, electrical and plumbi…
Interior renovation of an existing three (3)-story building + cellar + communal amenity penthouse. Change of use from commercial to mixed use with office spaces located on the firs…
A new bathroom will be constructed on the second floor. The previous use of that area was a sunroom. In order to get additional space, all the glass windows were demolished. The Wa…
Work includes the renovation of the existing arena event floor, which includes construction of (10) new suites, renovation of team spaces, renovation of the existing club at event…
Permit to renew existing expired permit B2208749 to obtain final inspections. SCOPE OF WORK: 1. Construction of new 3-story plus cellar rear addition to existing masonry 2-unit bui…
New interior construction including new partitions, finishes, fixtures, plumbing, electrical and mechanical. no structural
Scope of work includes level 2 alteration of tenant space only (new interior partitions, ceiling, lighting, mechanical, plumbing, and fire alarm devices). existing base building eg…
Construct in-ground swimming pool in rear yard behind single-family dwelling, including mechanical, electrical and plumbing systems, and associated appurtenances.