Building Permits in ZIP 10016
Manhattan, NY — 1,059 permits filed recently
1,059 permits
Tisch Hospital - Limited mechanical alterations to restroom and shower areas on the 7th, 16th, and 17th floors, including exhaust and air distribution modifications. No change to use, occupancy, or eg...
Application filed for add new gas equipment in a exist. restaurant. plumbing work is filed in conjunction with #m01106366
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Floor 1 : interior renovation of existing lobby. cellar: interior renovation of fitness, corridor & bathrooms. change in use. no egress or occupancy change.
Removal and installation of sprinkler heads as shown on drawings. no change to use, egress or occupancy.
Mechanical work on partial 22nd floor as per plans. No change to use, egress or occupancy.
Interior renovation of existing 1st floor docotr's office as per final co #101045833f including the removal & installation of non-load bearing partitions, new floor & wall finishes as per the drawing...
Installation and use of mini crane for hoisting and installation of glass panels. no change in use, egress or occupancy.
Installation of temporary shoring for the sub-cellar and cellar. no change in use, egress, or occupancy.
STRUCTURAL JOB SCOPE - Opening in existing floor concrete drape mesh for convenience stair and suspended LULA elevator pit.
STRUCTURAL JOB SCOPE - Opening in existing floor concrete drape mesh for convenience stair and suspended LULA elevator pit.
Installation and use of mini crane for hoisting and installation of glass panels. no change in use, egress or occupancy.
Installation of temporary shoring for the sub-cellar and cellar. no change in use, egress, or occupancy.
Interior renovation of existing 1st floor docotr's office as per final co #101045833f including the removal & installation of non-load bearing partitions, new floor & wall finishes as per the drawing...
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Floor 1 : interior renovation of existing lobby. cellar: interior renovation of fitness, corridor & bathrooms. change in use. no egress or occupancy change.
Removal and installation of sprinkler heads as shown on drawings. no change to use, egress or occupancy.
Sprinkler work in conjunction with restaurant fit out
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Installation of suspended scaffold for facade work or inspection.