Building Permits in ZIP 10022
Manhattan, NY — 1,619 permits filed recently
1,619 permits
Interior demo & reno of non-load bearing partitions, walls, doors, frames, ceiling &n finishes as indicated on plans.
mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.
Provide plumbing fixtures in apartment 52k on the 42nd construction floor as per plans filed. no change in use, occupancy or egress
Plumbing work from the 32nd to the 34th floors as plans filed herewith. no change in use, egress or occupancy.
sprinkler work as shown on plans filed herewith. No change in use egress or occupancy,
Propose to perform plumbing and sprinkler work. No change in use, egress or occupancy.
Provide plumbing fixtures in apartment 52k on the 42nd construction floor as per plans filed. no change in use, occupancy or egress
Replacement in kind of four (4) existing condensers and six (6) existing evaporators, all located within penthouse a. no change to use, egress, or occupancy.
General refurbishment and minor alterations to select guestrooms
Work to include new partitions, acousticceilings, materials, fixtures, finishes & equipmentthroughout. work on 17th floor interiors only. no work will be done on egress components or elevators.
INTERIOR RENOVATION, NEW WALLS, NEW FLOORS, NEW KITCHEN & BATH , ON 3rd FLOOR APARTMENT 3B and 4TH FLOOR APT 4C
Installation of suspended scaffold for facade work or inspection.
Sprinkler modifications on 3rd floor related to office renovation
Installation of temporary roof protection over adjacent properties as per plans. roof protection shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applic...
Installation and use of temporary knuckleboom as per plans filed herewith. no change in use egress, or occupancy.
Mechanical work from the 32nd to the 34th floor as plans filed herewith. no change in use, egress, or occupancy.
Interior demo & reno of non-load bearing partitions, walls, doors, frames, ceiling &n finishes as indicated on plans.
Plumbing work from the 32nd to the 34th floors as plans filed herewith. no change in use, egress or occupancy.
mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.
sprinkler work as shown on plans filed herewith. No change in use egress or occupancy,