Building Permits in ZIP 11205
Brooklyn, NY — 607 permits filed recently
607 permits
Soe specifications filed in conjunction with nb application #b01309980-i1.
Hereby filing for the renovation of basement unit 1. no change in use, egress or occupancy.
Installation of a heavy duty sidewalk shed and pipe scaffold as per plans during new building work. no change in use, egress or occupancy. sidewalk shed & pipe scaffold to comply with chapter 33 of ny...
Alteration filed for exisitng 3 family dwelling- interior renovations and extension; there will be no change to the use, egress or occupancy.
ST plans filed in conjunction is GC application B01028619-I1
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Installation of material hoist on the roof. installation shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application,
Installation of material hoist on the roof. installation shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application,
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
ST plans filed in conjunction is GC application B01028619-I1
Installation of construction fence
Plumbing and sprinkler work in conjunction with alteration co
New 3 story 2-family building
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
PROPOSED INSTALLATION OF 2 ILLUMINATED, NON FLASHING, ACCESSORY BUSINESS SIGNS, FIRST SIGN WORDING TOUS les JOURS BAKERY CAFE. SECOND SIGN WORDING TLJ BAKERY CAFE.
Scope of work is solely for the installation of the solar electronic generating system. all other work is not to be relied upon as beingapproved and/or permitted by the nyc department of buildings
Scope of work is solely for the installation of the solar electronic generating system. all other work is not to be relied upon as beingapproved and/or permitted by the nyc department of buildings
Plumbing and sprinkler work in conjunction with alteration co
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
New 3 story 2-family building