Building Permits in ZIP 11205
Brooklyn, NY — 613 permits filed recently
613 permits
Interior renovation of duplex apartment. new millwork and appliances. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Erect non-illuminated accessory business wall sign for met fresh.
Erect illuminated accessory business wall sign for met fresh.
Structural application:install new c-joists throughout ;install beams at 2nd and 3rd floor extension;there will be no change to use, egress or occupancy.
Proposing vertical and horizontal enlargement to an existing residential building.
Structural work type hereby filed subsequent to the NB GC application: B01061790-I1
Soe worktype herewith filed for new building
Structural application:install new c-joists throughout ;install beams at 2nd and 3rd floor extension;there will be no change to use, egress or occupancy.
Proposing vertical and horizontal enlargement to an existing residential building.
Structural work type hereby filed subsequent to the NB GC application: B01061790-I1
Herewith filing architectural work for facade repairs, new ramp and railing as per plans. no change in use, egeress or occupancy.
Herewith filing architectural work for facade repairs, new ramp and railing as per plans. no change in use, egeress or occupancy.
Installation of sidewalk shed as per plans filed herewith.
Installation of pipe scaffold at 204 brooklyn navy yard, brooklyn, ny 11205 as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of 6000 lb single personnel hoist car as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress, or occupancy under this application...
Structural work in conjunction with NB #321592763.
Erection of temporary structure for lpc review