Building Permits in ZIP 11217
Brooklyn, NY — 787 permits filed recently
787 permits
ACS Core Climbing Wall Formwork
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
RCS-G / MAXIMO Climbing Wall Formwork
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application
Installing a concrete placing pump along with the required shoring and supports extending throughout the full height of the building.
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
Mechanical work as per plans. No change in use, egress or occupancy (Baseline Club)
structural work as per plans. No change in use, egress or occupancy (Baseline Club)
Subsequent filing for fence work on open space, in conjunction with alt-co application #b01181924-i1.
Subsequent filing for fence work on open space, in conjunction with alt-co application #b01181924-i1.
Plumbing work as per plans. No change in use, egress or occupancy (Baseline Club)
Installing a concrete placing pump along with the required shoring and supports extending throughout the full height of the building.
ACS Core Climbing Wall Formwork
Removal and installation of interior partitions as per plans. No change in use, egress or occupancy (Baseline Club)
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
RCS-G / MAXIMO Climbing Wall Formwork
structural work as per plans. No change in use, egress or occupancy (Baseline Club)
Mechanical work as per plans. No change in use, egress or occupancy (Baseline Club)
Plumbing work on unit #1. construction work as per plan. nochange in egress, use or occupancy.