DevHUB Consultation 7.18.2025. Temporary bracing in conjunction with Alt CO M01262427-I1.
New mechanical equipment for heating and ventilation for new 18 sty new building.
DevHUB Consultation 7.18.2025. Application filed for new openings and repair on existing facade and select interior demolition as noted in plans. No change in use, egress or occupa…
Herewith filing mechanical work as per plans
All new mechanical equipment for heating and ventilation for new 20 story residential building (121187820)
New Building
Modification of mechanical ductwork as per plans filed herewith. no change in use, egress or occupancy.
Nstallation of partitions as per plans. no change in use, egress or occupancy.
Alteration application filed herewith to install temporary construction offices and shanties at the cellar, 1st floor, and 2nd floor. no change of use, occupancy or permanent egres…
Herewith filing new mixed-use building as per plans.
Mechanical work in conjunction with NB # M00951363.
Filing herewith for the super structure for vertical expansion.
Alt-co application filed to convert both towers (north & south) of an existing commercial hotel (ug 5) to ug ii residential. new cofo to be obtained.
Shallow foundation work for concrete caisson under equipment hoists on 57th street side.
Shallow foundation for concrete caisson under equipment hoists on 56th street.
New 14-story mixed use building