Search Building Permits
95,829 permits
Full Demolition - complete demolition to create vacant lot
Change of Use - Wholesale, Distribution, and Storage - Equipment and Materials Storage Yards and Buildings; Wholesale, Distribution, and Storage - Moving and Storage Facilities
Change of Use - Limited Lodging
New construction, addition, GFA change - For the erection of an attached structure. Size and location as shown on the plan.
Change of Use - Visitor Accommodations
New construction, addition, GFA change - ERECTION OF AN ATTACHED STRUCTURE WITH TWO ROOF ACCESS STRUCTURES AND TWO ROOF DECK ACCESSED BY INDIVDUAL DWELLING UNITS. SIZE AND LOCATION AS SHOWN ON PLANS
New construction, addition, GFA change - New construction of a three story structure with 8' front setback, six dwelling units proposed NO roof decks permitted as per approved plan NTE 38' in height
Change of Use - Medical, Dental, and Health Practitioner - Sole Medical, Dental, and Health Practitioner
addition to existing 3rd floor to remodel existing rooms & add new bedroom and balcony.
New construction, addition, GFA change - For the partial demolition at the rear to be replaced with the erection of an addition at the rear, two (2) roof decks and two (2) roof deck access structures....
Change of Use - Vehicle Paint Finishing Shop.; Personal Vehicle Repair and Maintenance.
Change of Use - Retail Sales - Consumer Goods; Retail Sales - Food, Beverages, and Groceries
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
New construction, addition, GFA change - FOR THE ERECTION OF A TWO-STORY REAR ADDITION ON AN EXISTING ATTACHED STRUCTURE USED AS A SINGLE-FAMILY DWELLING; SIZE AND LOCATION AS SHOWN ON THE PLAN.
Change of Use - Personal Services; Office - Business and Professional
Change of Use - Residential - Household Living - Single-Family
reroof, no hot work - flat roof replacement (tpo), no redeck, no hot works.
unit 1- remodel in kind of bathroom and kitchen (n) plumbing and electrical add insulation. no wall removal or layout change
unit 10- remodel in kind of bathroom and kitchen (n) plumbing and electrical add insulation. no wall removal or layout change
New construction, addition, GFA change - For the erection of an attached structure. Size and location as shown in plans.