Search Building Permits
3,011 permits · New Construction
New construction, addition, GFA change - For the erection of an attached structure. Size and location as shown on the plan.
New construction, addition, GFA change - ERECTION OF AN ATTACHED STRUCTURE WITH TWO ROOF ACCESS STRUCTURES AND TWO ROOF DECK ACCESSED BY INDIVDUAL DWELLING UNITS. SIZE AND LOCATION AS SHOWN ON PLANS
New construction, addition, GFA change - New construction of a three story structure with 8' front setback, six dwelling units proposed NO roof decks permitted as per approved plan NTE 38' in height
New construction, addition, GFA change - For the partial demolition at the rear to be replaced with the erection of an addition at the rear, two (2) roof decks and two (2) roof deck access structures....
New construction, addition, GFA change - FOR THE ERECTION OF A TWO-STORY REAR ADDITION ON AN EXISTING ATTACHED STRUCTURE USED AS A SINGLE-FAMILY DWELLING; SIZE AND LOCATION AS SHOWN ON THE PLAN.
New construction, addition, GFA change - For the erection of an attached structure. Size and location as shown in plans.
New Construction - FOR THE INSTALLATION OF AN NFPA 13R SYSTEM FOR A SINGLE-FAMILY DWELLING SERVICED BY A TWO (2) INCH FIRE SERVICE LINE WITH A 2-INCH WILKINS 950XLT2 BACKFLOW PREVENTER AND AUTOMATIC F...
New Construction - FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE AS PER APPROVED PLANS. FOR USE AS THREE (3) DWELLING UNITS. STRUCTURE TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13. **...
New Construction - FOR INSTALLATION OF TWO (2) ONE-INCH FIRE/DOMESTIC WATER SERVICE LINES AND TWO (2) FIRE SPRINKLER SYSTEMS PER APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 13D.
New Construction - FOR THE INSTALLATION OF A 2-INCH FIRE SERVICE LINE FOR AN AUTOMATIC FIRE SUPPRESSION SPRINKLER SYSTEM WITH A 2 INCH WILKINS 950XLT2BFSS BACKFLOW PREVENTION ASSEMBLY IN ACCORDANCE WI...
New Construction - FOR THE INSTALLATION OF AN NFPA 13R SYSTEM FOR A MULTI-FAMILY DWELLING SERVICED BY A TWO (2) INCH FIRE SERVICE LINE WITH A 2-INCH WILKINS 950XLT2 BACKFLOW PREVENTER AND AUTOMATIC FI...
Support of excavation being filed for new building.
Foundation application being filed for new building.
Subsequent filing for structural & foundation scope of work associated with the new building.
Installation of pipe scaffolding during new building construction as per plan and in accordance with Chapter 33 of NYC Building Code.
Use of Telehandler for SOE and foundation construction. This application is filed in conjunction with NBQ01118133-I1
Subsequent filing for building fire sprinkler system scope of work only associated with the new building.
Structural scope for new building filed in conjunction with application M00951038-I1
Filing temporary fire alarm/ standpipe in conjunction with nb app q01049852
Construction of 1 story new building for new pneumatic waste collection system for the polo grounds nycha campus in harlem. related applications to be filed as subsequent applications.