Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
North Elevation Facade Repairs, no change in use, egress or occupancy.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Herewith filing for full demolition of a fire damaged (1) story building used as a warehouse as per plans. a 2-man crew will utilize an 80 ft articulating boom lift to safely acces…
Herewith filing for full demolition of a fire damaged (1) story building used as a warehouse as per plans. a 2-man crew will utilize an 80 ft articulating boom lift to safely acces…
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Nicholas Kagios, Special Rig…
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Nicholas Kagios, Special Rig…
Exterior facade repairs including lintels/windowsills replacements as necessary and per plans submitted. No change in use, occupancy or egress proposed under this application.
Replacement of glass railings on 10th and 12th floor terraces to respond and resolve vate order and violation #07252325ll011do3. no change in use, egress, or occupancy.
Removal and replacement of localized parapet, replacement of steel lintels, replacement of misc. brick masonry and stucco coatings at all exposures. No change to egress of occupanc…
Replacement of glass railings on 10th and 12th floor terraces to respond and resolve vate order and violation #07252325ll011do3. no change in use, egress, or occupancy.
Removal and replacement of localized parapet, replacement of steel lintels, replacement of misc. brick masonry and stucco coatings at all exposures. No change to egress of occupanc…
Exterior facade repairs including lintels/windowsills replacements as necessary and per plans submitted. No change in use, occupancy or egress proposed under this application.
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Nicholas Kagios, Special Rig…
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Nicholas Kagios, Special Rig…