Other Permit — 120 5 AVENUE
Other
$311,100
Gfx Site Development Inc
gary griggs
Kings County
Work Description
Installation of mechanical system and related piping as shown on drawings. no change to occupancy use or egress.
Other permits at this address
10 other permits at 120 5 AVENUE. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Modification to existing sprinkler system as shown on drawings. no change to occupancy use or egress.
Modification to existing sprinkler system as shown on drawings. no change to occupancy use or egress.
Proposed tenant layout only. work to include new interior partitions, finishes and fixtures for a new fitness center. plumbing, mechanical, sprinkler, and structural to be filed separate. no change to...
Installation of mechanical system and related piping as shown on drawings. no change to occupancy use or egress.
Proposed tenant layout only. work to include new interior partitions, finishes and fixtures for a new fitness center. plumbing, mechanical, sprinkler, and structural to be filed separate. no change to...
Installation of plumbing fixtures and related piping as shown on drawings. no change to occupancy use or egress.
Installation of plumbing fixtures and related piping as shown on drawings. no change to occupancy use or egress.
Proposed structural reinforcement and concrete pit wall and slab for a new elevator. framing work as shown on drawings. no change to occupancy use or egress.
Proposed structural reinforcement and concrete pit wall and slab for a new elevator. framing work as shown on drawings. no change to occupancy use or egress.
Proposed tenant layout only. work to include new interior partitions, finishes and fixtures for a new fitness center. plumbing, mechanical, sprinkler, and structural to be filed separate. no change to...
More Other permits in Brooklyn
Foundation application in conjunction with approved gc #b01084269-i1
Relocate sp heads in cel, 1-3. removal of ex. gas-fired water heaters + assoc. piping. reroute ex. domestic hot + cw piping. no change in use, egress or occupancy.
Relocate sp heads in cel, 1-3. removal of ex. gas-fired water heaters + assoc. piping. reroute ex. domestic hot + cw piping. no change in use, egress or occupancy.
Upper vale-construct new open air planted arbor. related foundation and structural work. structure is an unenclosed exterior trellis/pergola 12' ht. no change to use, egress or occupancy.
Refiling structural application as DOB #321997997 could not be reinstated. Work to include rear extension framing and proposed opening in masonry facade