Plumbing Permit — 139 EAST 63 STREET
Plumbing
$85,000
Big Apple Designs And Env
Max Hecht
New York County
Work Description
General construction to renovate apt 3b on the 3rd floor. work will include new partitions and finishes, and new plumbing fixtures. no change in use, egress, or occupancy under this filing.
Other permits at this address
9 other permits at 139 EAST 63 STREET. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Interior Renovation of an existing apartment that includes bedroom, kitchen and bathroom. Existing fixtures and appliances to be replaced. New washer/dryer to be installed. No change to egress use or...
Interior Renovation of an existing apartment that includes bedroom, kitchen and bathroom. Existing fixtures and appliances to be replaced. New washer/dryer to be installed. No change to egress use or...
Hereby filing for the interior renovation of existing apartment 8d located on the 8th floor. no change to use occupancy or egress.
Hereby filing for the interior renovation of existing apartment 8d located on the 8th floor. no change to use occupancy or egress.
Replace plumbing fixtures with new at existing roughing (1 sink, 1 dw) at apt 3b on the 3rd floor
Replace plumbing fixtures with new at existing roughing (1 sink, 1 dw) at apt 3b on the 3rd floor
General construction to renovate apt 3b on the 3rd floor. work will include new partitions and finishes, and new plumbing fixtures. no change in use, egress, or occupancy under this filing.
Herewith filing for the interior renovation of one apartment in an existing 16 story, mixed-use building. no other work proposed under this application.
Herewith filing for the interior renovation of one apartment in an existing 16 story, mixed-use building. no other work proposed under this application.
More Plumbing permits in Manhattan
Plumbing filed in conjunction of 20-story nycha multiple dwelling as part of the nycha pact renovation: replacement of existing kitchen and bathroom fixtures on existing rough in, no change to use, eg...
Plumbing and sprinkler work associated with eating or drinking establishment tenant fitout work.
Plumbing work at cellar filed in conjunction with renovation of 6-story nycha multiple dwelling as part of the nycha pact renovation: installation of new booster pump and hot water heaters. no change...
Job filed for plumbing work in conjunction with gc application for medical office at first floor. work includes installation of five (5) new non-res-sinks and two (2) new toilets on new roughing.
Interior renovation at apt. 14a on 014. minor partition workand plumbing work as per plan. plumbing work will be filed subsequently with this application. no change in use, egressor occupancy in this...