Roofing Permit — 140 WEST 65 STREET
Roofing
$34,900,658
Turner Construction Compa
Darren Robertson
New York County
Work Description
Filing herewith structural partial demolition scope inside garage/parking structure and at the garage/parking structure roof/plaza level which includes a slab cut as per plans. No change in use, occupancy, or egress proposed under this application.
Other permits at this address
10 other permits at 140 WEST 65 STREET. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Filing for repairs to this existing parking garage. No change to use, egress or occupancy.
Filing herewith plumbing demolition inside the garage/parking structure to make way for new theater building/structure as per plans. No change in use, occupancy, or egress under this application.
Phase 2: Partial Demolition Means & Methods for park and garage/parking structure as per plans.
Phase 2: Partial Demolition Means & Methods for park and garage/parking structure as per plans.
Temporary structures for a red carpet at JRP plaza. Removed at the end of the programing. No changes to existing structures, use or egress.
Temporary structures for a red carpet at JRP plaza. Removed at the end of the programing. No changes to existing structures, use or egress.
Filing herewith structural scope for the removal of the historical Guggenheim bandshell. No change in use, occupancy, or egress under this application.
Filing herewith structural scope for the removal of the historical Guggenheim bandshell. No change in use, occupancy, or egress under this application.
Use of Mechanical demolition equipment during partial demolition, filed separately under M01299014-S5.
Use of mechanical demolition equipment during Phase 1 Damrosch Park alteration, filed separately under M01346293.
More Roofing permits in Manhattan
New slab openings and infill. install new elevator core and stair bulkhead. reinforce existing floor framing. work on floors 01-03 & roof. filed in conjunction with alt-co #m00972936.
CONSTRUCTION OF NEW ACCESS STAIR, LOUVERED SCREEN AND RAILING ON ELEVATED STEEL PLATFORM ON UPPER AND LOWER LEVELS.NEW GRATING ON LOWER LEVEL OF TANK PLATFORM AND NEW GRATING ON UPPER LEVEL OF TANK PL...
Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary overhead protection per plan. no change in use, egress, or occupancy. the overhead protection at 110 greenwich st roofs/terrace. and in the courtyard east at 102 &110 & 108 &...
Modification to existing Verizon site. Replace 6 antennas, remove 3 antennas, install 3 antennas, replace 9 RRH units, remove RRH rack, and install 1 equipment cabinet on an existing platform on the r...