Plumbing Permit — 181 HOYT STREET
Plumbing
$311,664
V. C. Vitanza Sons Inc
Michele Moore
Kings County
Work Description
NYCHA/Gowanus/B3- (181 & 187 HOYT)_Replace all plumbing fixtures in kitchen and bathroom of all apartments. Replace all Domestic Hot Water riser shut off valves. Installation of point-of-use fixture leak detection and riser metering for leak detection
Other permits at this address
5 other permits at 181 HOYT STREET. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
NYCHA/Gowanus/Bldg#3- (181 & 187 HOYT STREET). Int. reno. incl. repl. of kitchen & bath fixt., finishes, & cab.; upgrades to doors, partitions, & flooring. Accessibility work per BC-Ch.11 & Section504...
NYCHA/Gowanus/B3-Replace apt. toilet exhaust grilles w/ new grilles w/ OBDs. Install recirc. kitchen hoods. Replace radiator valves, vents & traps w/ self-cont. thermostatic valves, iso valves & traps...
NYCHA/Gowanus/B3- (181 & 187 HOYT)_Replace all plumbing fixtures in kitchen and bathroom of all apartments. Replace all Domestic Hot Water riser shut off valves. Installation of point-of-use fixture l...
NYCHA/Gowanus/Bldg#3- (181 & 187 HOYT STREET). Int. reno. incl. repl. of kitchen & bath fixt., finishes, & cab.; upgrades to doors, partitions, & flooring. Accessibility work per BC-Ch.11 & Section504...
NYCHA/Gowanus/B3-Replace apt. toilet exhaust grilles w/ new grilles w/ OBDs. Install recirc. kitchen hoods. Replace radiator valves, vents & traps w/ self-cont. thermostatic valves, iso valves & traps...
More Plumbing permits in Brooklyn
Propose plumbing work only to replace one (1) pvc pipe with cast iron pipe in cellar of existing 3-story building. no work for existing mechanical room, existing gas meters, or electric meters.
Plumbing work filed in conjuction with alt-co as per plans filed herewith.
P.S. 44-K: Modification of Building Plumbing in association to Accessibility project at school and in conjunction with architectural scope of work including new Elevator.
Removal of plumbing work as per plans. No change in use, egress or occupancy (Box Office/Flatbush Entry/Lobby)
Subsequent application filed for plumbing modifications/additions in the cellar and on the 1st floor (stretch lab) as per plans filed herewith. no change in use, egress, or occupancy