Roofing Permit — 200 LAFAYETTE STREET
Roofing
$21,000
Hydronic Concepts Ny Plbg
Ryan Mcgann
New York County
Work Description
Installation of plumbing fixtures within an existing bulkhead on the roof as indicated on the drawings.
Other permits at this address
10 other permits at 200 LAFAYETTE STREET. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Plumbing modifications taking place on the 6th & 7th floors as indicated on the drawings..
Sprinkler modifications taking place on the 6th & 7th floors as indicated on the drawings.
Plumbing modifications taking place on the 6th & 7th floors as indicated on the drawings..
Sprinkler modifications taking place on the 6th & 7th floors as indicated on the drawings.
Installation of AC units taking place on the roof as indicated on the drawings.
Installation of AC units taking place on the roof as indicated on the drawings.
Structural modifications taking place on the 6th & 7th floors as indicated on the drawings.
Structural modifications taking place on the 6th & 7th floors as indicated on the drawings.
Mechanical modifications taking place on the 6-7th floors as indicated on the drawings.
Construction modifications taking place on the 3-4th & 6-7th floors as indicated on the drawings.
More Roofing permits in Manhattan
New slab openings and infill. install new elevator core and stair bulkhead. reinforce existing floor framing. work on floors 01-03 & roof. filed in conjunction with alt-co #m00972936.
CONSTRUCTION OF NEW ACCESS STAIR, LOUVERED SCREEN AND RAILING ON ELEVATED STEEL PLATFORM ON UPPER AND LOWER LEVELS.NEW GRATING ON LOWER LEVEL OF TANK PLATFORM AND NEW GRATING ON UPPER LEVEL OF TANK PL...
Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary overhead protection per plan. no change in use, egress, or occupancy. the overhead protection at 110 greenwich st roofs/terrace. and in the courtyard east at 102 &110 & 108 &...
Modification to existing Verizon site. Replace 6 antennas, remove 3 antennas, install 3 antennas, replace 9 RRH units, remove RRH rack, and install 1 equipment cabinet on an existing platform on the r...