Plumbing Permit — 281 THROOP AVENUE
Plumbing
$175,000
Dual Fuel Plubing & Hting
Amy Stokes
Kings County
Work Description
Installation and replacement of the plumbing fixtures. no change to use, egress or occupancy.
Other permits at this address
8 other permits at 281 THROOP AVENUE. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Beta-max hoist installed in order to lift material to perform facade repairs. sidewalk shed filed under separate application.
Replacement of existing kitchen and bathroom fixtures on existing rough in. no change to existing use, occupancy or egress is proposed under this application.
Replacement of existing kitchen and bathroom fixtures on existing rough in. no change to existing use, occupancy or egress is proposed under this application.
Replacement of apartment thermostatic radiator valves and steam traps; upgrade of existing ventilation system; installation of new hvac systems. no change to existing use, occupancy or egress is propo...
Replacement of apartment thermostatic radiator valves and steam traps; upgrade of existing ventilation system; installation of new hvac systems. no change to existing use, occupancy or egress is propo...
Installation of new boilers as shown on proposed plan as well as all other heating system associated components located in the boiler room. no change to use, egress or occupancy.
Installation of new boilers as shown on proposed plan as well as all other heating system associated components located in the boiler room. no change to use, egress or occupancy.
Installation and replacement of the plumbing fixtures. no change to use, egress or occupancy.
More Plumbing permits in Brooklyn
Propose plumbing work only to replace one (1) pvc pipe with cast iron pipe in cellar of existing 3-story building. no work for existing mechanical room, existing gas meters, or electric meters.
Plumbing work filed in conjuction with alt-co as per plans filed herewith.
P.S. 44-K: Modification of Building Plumbing in association to Accessibility project at school and in conjunction with architectural scope of work including new Elevator.
Removal of plumbing work as per plans. No change in use, egress or occupancy (Box Office/Flatbush Entry/Lobby)
Subsequent application filed for plumbing modifications/additions in the cellar and on the 1st floor (stretch lab) as per plans filed herewith. no change in use, egress, or occupancy