Other Permit — 370 MARCY AVENUE
Other
$240,000
Volmar Construction Inc
Ramesh Narayan
Kings County
Work Description
The scope of work includes the installation of the supplemental cooling systems for the 1st floor gymnasium.
Other permits at this address
7 other permits at 370 MARCY AVENUE. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
OT: Remove doors, walls, partitions, flooring, finishes, ceilings, and provide new. Provide small building addition to create new entry to building. No change in use, occupancy, or egress.
OT: Remove doors, walls, partitions, flooring, finishes, ceilings, and provide new. Provide small building addition to create new entry to building. No change in use, occupancy, or egress.
Filing for temporary construction fence. No change in use, egress or occupancy.
ST: Provide new Structural Steel, Structural Concrete, and Structural Masonry. No change in Use, Occupancy, or Egress.
Filing for temporary construction fence. No change in use, egress or occupancy.
ST: Provide new Structural Steel, Structural Concrete, and Structural Masonry. No change in Use, Occupancy, or Egress.
The scope of work includes the installation of the supplemental cooling systems for the 1st floor gymnasium.
More Other permits in Brooklyn
Foundation application in conjunction with approved gc #b01084269-i1
Relocate sp heads in cel, 1-3. removal of ex. gas-fired water heaters + assoc. piping. reroute ex. domestic hot + cw piping. no change in use, egress or occupancy.
Relocate sp heads in cel, 1-3. removal of ex. gas-fired water heaters + assoc. piping. reroute ex. domestic hot + cw piping. no change in use, egress or occupancy.
Upper vale-construct new open air planted arbor. related foundation and structural work. structure is an unenclosed exterior trellis/pergola 12' ht. no change to use, egress or occupancy.
Refiling structural application as DOB #321997997 could not be reinstated. Work to include rear extension framing and proposed opening in masonry facade