Other Permit — 375 PARK AVENUE
Other
$25,000
Midnight Express Mech Crp
Lauren Belanger
New York County
Work Description
Removal of existing sprinkler system and installation of temporary core sprinkler protection loop on 8th floor as per drawings. no change to use, egress or occupancy.
Other permits at this address
10 other permits at 375 PARK AVENUE. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Interior renovaition on 27th floor office space as per plans. no change to use, egress or occupancy.
Interior renovaition on 27th floor office space as per plans. no change to use, egress or occupancy.
Removal and installation of plumbing fixtures and associated piping for the 8th floor office space as per plans. no change to use, egress or occupancy.
Removal and installation of plumbing fixtures and associated piping for the 8th floor office space as per plans. no change to use, egress or occupancy.
Installation of ductwork, diffusers, fans, a/c unit, and related mechanical piping. on 20th floor office space. no change to use, egress or occupancy.
Installation of plumbing fixtures and associated piping for the 20th floor office space as per plans. no change to use, egress or occupancy.
Installation of plumbing fixtures and associated piping for the 20th floor office space as per plans. no change to use, egress or occupancy.
Installation of ductwork, diffusers, fans, a/c unit, and related mechanical piping. on 20th floor office space. no change to use, egress or occupancy.
Installation of new non-load bearing walls, doors, wall and floor finishes, ceilings, and millwork and removal of floor finishes on 20th floor office space as per plans. no change to use, egress or oc...
Removal of existing sprinkler and installation of temporary sprinkler loop on 20th floor as per drawings. no change to use, egress or occupancy.
More Other permits in Manhattan
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Installation of sidewalk shed and supported scaffold as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Replace bathroom Flooring, refinish existing wood flooring, new interior doors, remove partial non load bearing partition @ kitchen, New cabinets & millwork. No change in use, egress, or occupancy.
Installation of new tru-wall a/c wall unit. Requiring removal of brick exterior wall of the size of 27x16 for sleeve and installation of 5/8x8 flat steel lintel