Renovation Permit — 4000 LOCUST ST
Renovation
Not listed
Precision Sprinkler Services, Inc
Trs Univ Of Penn
Philadelphia County
Work Description
Addition and/or Alterations - EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 37 sprinkler heads to accommodate the new building alterations.
Other permits at this address
5 other permits at 4000 LOCUST ST. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Temporary Tents and Canopies - ASSEMBLY USE TENT - LAWFUL OCCUPANCY SHALL BE AS POSTED - REMOVAL DATE ELECTRICAL PERMIT REQUIRED, UNLESS POWER IS PROVIDED THROUGH EXISTING EXTERIOR GROUND FAULT PROTEC...
Addition and/or Alteration - DEMO/ TEMPORARY LIGHTNG & POWER/ ADD NEW POWER PANELS/ADD NEW BRANCH WIRING/ADD NEW LIGHTING AND LIGHTING CONTROLS as per electrical plans-2017 NEC. AMENDMENT: Install fir...
Addition and/or Alterations - FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WO...
Alterations - For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standar...
Addition and/or Alteration - FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIB...
More Renovation permits in Philadelphia
Addition and/or Alterations - EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require su...
Addition and/or Alteration - FOR THE STRUCTURAL REPAIR WORK TO HEAVY TIMBER TRUSS AND CATWALK STRUCTURE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY W...
Addition and/or Alteration - FOR THE ERECTION OF AN ADDITION AND LEVEL III ALTERATIONS FOR CHANGE OF OCCUPANCY TO GROUP R-2 (47 DWELLING UNITS) TO INCLUDE STRUCTURAL WORK, NEW PARTITIONS, FIXTURES, FU...
Addition and/or Alteration - ***INSPECTOR TO CONFIRM BASEMENT CEILING HEIGHT*** The basement MUST an EXISTING, habitable space with code compliant ceiling heights and means of egress. - For alteration...
Addition and/or Alteration - FOR LEVEL II ALTERATIONS TO AN EXISTING 6TH FLOOR TENANT SPACE (610). ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNI...