Other Permit — 410 10 AVENUE
Other
$5,000
New York City Prime Corp
Zeeshan Ahmed
New York County
Work Description
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Other permits at this address
8 other permits at 410 10 AVENUE. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Suspended scaffold outrigger system for exterior facade repair works and inspection at 410 10 avenue, manhattan, ny 10001
Suspended scaffold outrigger system for exterior facade repair works and inspection at 410 10 avenue, manhattan, ny 10001
Modifications to the existing plumbing system in basement (Le Cafe) as per plans. No change to use, egress or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes in the basement & Storefront (LL Work) as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 1st floor (Landlord Work) as per plans. No change to use, egress or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes in the basement & Storefront (LL Work) as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 1st floor (Landlord Work) as per plans. No change to use, egress or occupancy.
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
More Other permits in Manhattan
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Installation of sidewalk shed and supported scaffold as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Replace bathroom Flooring, refinish existing wood flooring, new interior doors, remove partial non load bearing partition @ kitchen, New cabinets & millwork. No change in use, egress, or occupancy.