Plumbing Permit — 4209 FARHILLS DR
Plumbing
Not listed
Travis County
Work Description
Tunnel under foundation to replace cast iron drain lines for 3 full bathrooms and a half bathroom and also including kitchen and washer drain line. Total of 4 access holes will be made one in the front the second on the left side of the home the third will be made in the back by the kitchen area and the fourth will be made on the right side of the home. Total length of tunnel is approximately 145 feet. Sewer line will also be replaced from the home to the city tap with the length of 72 feet.
More Plumbing permits in Austin
*Partial Demo* Interior remodel of condo SFR
install gas pipe for generator
ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [3bed 2bath] Work to include: First floor addition new bed new bath [4bed 3bath] and modify driveway t...
New construction of a 2-Story Single Family Res. [4 bed 3.5 bath] with Attached carport
Replacing kitchen sink waste water going around east side 85 feet and tying into main replacing cast iron under front side of house tunneling approximately 8 feet under foundation to vanity 6 feet to...