New Construction - Install a 600-amp electrical service and a seven-meter pack with proper grounding and bonding. Install one 100-amp subpanel for the house, one 125-amp subpanel for each of the four dwelling units, and one 150-amp subpanel for each of the remaining two dwelling units. Provide all associated wiring, lighting, switches, and receptacle outlets. Install interconnected smoke and carbon monoxide alarms. Install a complete fire alarm system. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER APPROVED PLANS.