Exterior work as per plans filed herewith. work includes localized masonry replacement, replacement of terra cotta units with new precast concrete units precast concrete coping replacement, roof replacement. no change to use, egress, or occupancy.
Other permits at this address
8 other permits at 440 WEST END AVENUE. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
SUB-PL plans filed in conjunction with construction to remove (1) washer/dryer, (1) WC, & (1) sink; install (1) DW & (1) kitchen sink; renovate (4) bathrooms; replace (4) WCs, (7) lavatories, (1) tub,...
SUB-PL plans filed in conjunction with construction to remove (1) washer/dryer, (1) WC, & (1) sink; install (1) DW & (1) kitchen sink; renovate (4) bathrooms; replace (4) WCs, (7) lavatories, (1) tub,...
Apt 15/16b interior dwelling unit minor interior renovation modification of kitchen, non-bearing wall modifications.renovate 4 bathrooms. new finishes and fixtures. no change of use/occupancy or egres...
Apt 15/16b interior dwelling unit minor interior renovation modification of kitchen, non-bearing wall modifications.renovate 4 bathrooms. new finishes and fixtures. no change of use/occupancy or egres...
Apt 15/16b interior dwelling unit minor interior renovation modification of kitchen, non-bearing wall modifications.renovate 4 bathrooms. new finishes and fixtures. no change of use/occupancy or egres...
Installation of suspended scaffold for facade inspection/repair.
Installation of suspended scaffold for facade inspection/repair.
Exterior work as per plans filed herewith. work includes localized masonry replacement, replacement of terra cotta units with new precast concrete units precast concrete coping replacement, roof repla...
More Roofing permits in Manhattan
Facade repairs including the replacement of roof pavers as indicated on the plans filed herewith. no change in use, egress or occupancy.
Modification of mechanical systems on parts of Sub Cellar, Cellar, mezzanine, 23, 24, 51, 52 and Roof as indicated on attached plans. There is no change in occupancy, use or egress.
Interior removal of walls, doors, floor finishes, and ceilings on all floors; removal of windows and non-structural masonry wall infill; roof waterproof membrane assembly to the existing roof slab; an...
Installation of existing deployable stage roof, temporary performance platform, bleachers, decking, tenting. No alteration to existing structures for Summer Stage Concerts. A TPA permit is required.
Filing herewith administrative application illustrating structural slab openings at lower and upper concourse and at garage roof/plaza level (at Damrosch Park) to make way for new theater building/str...