Other Permit — 450 EAST 29 STREET
Other
$144,000
Structure Tone, Llc
Josh Mitchell
New York County
Work Description
Structural modifications as per plans filed herewith. General construction. Handrail support steel. Modernfold support steel. No change of use, occupancy or egress.
Other permits at this address
10 other permits at 450 EAST 29 STREET. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Plumbing and sprinkler systems installation as shown on plans filed herewith. no change in use, egress, or occupancy.
Modifications to plumbing and sprinkler systems as per plans filed herewith. No change of use, occupancy or egress.
Modifications to plumbing and sprinkler systems as per plans filed herewith. No change of use, occupancy or egress.
Structural modifications as per plans filed herewith. General construction. Handrail support steel. Modernfold support steel. No change of use, occupancy or egress.
Removal of plumbing systems. no change to occupancy, use, or egress.
Plumbing and sprinkler systems installation as shown on plans filed herewith. no change in use, egress, or occupancy.
Removal of plumbing systems. no change to occupancy, use, or egress.
Plumbing and sprinkler systems installation as shown on plans filed herewith. no change in use, egress, or occupancy.
Plumbing and sprinkler systems installation as shown on plans filed herewith. no change in use, egress, or occupancy.
Modifications to plumbing and sprinkler systems as per plans filed herewith. No change of use, occupancy or egress.
More Other permits in Manhattan
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Installation of sidewalk shed and supported scaffold as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Replace bathroom Flooring, refinish existing wood flooring, new interior doors, remove partial non load bearing partition @ kitchen, New cabinets & millwork. No change in use, egress, or occupancy.
Installation of new tru-wall a/c wall unit. Requiring removal of brick exterior wall of the size of 27x16 for sleeve and installation of 5/8x8 flat steel lintel