Other Permit — 52 VANDERBILT AVENUE
Other
$16,700
Cma Plumbing & Heating In
David Brause
New York County
Work Description
Modifications to Existing Sprinkler System on Part of the 11th Floor
Other permits at this address
10 other permits at 52 VANDERBILT AVENUE. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Propose to install new non-illuminated stainless steel letters on aluminum raceway for existing commercial space at 1st floor. no change to use, egress or occupancy.
Propose to install new non-illuminated stainless steel letters on aluminum raceway for existing commercial space at 1st floor. no change to use, egress or occupancy.
Modifications to Existing Sprinkler System on Part of 16th Floor
Modifications to Existing Sprinkler System on Part of 16th Floor
Demolition and Construction of Partitions, Doors, Suspended Ceiling, Millwork, Floor & Wall Finishes on Part of 16th Floor. No Change to Occupancy, Use or Egress is Proposed
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
Modify existing plumbing fixtures and sprinkler system as per plan.
Modify existing plumbing fixtures and sprinkler system as per plan.
Modifications to Existing Sprinkler System on Part of the 11th Floor
More Other permits in Manhattan
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Installation of sidewalk shed and supported scaffold as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Replace bathroom Flooring, refinish existing wood flooring, new interior doors, remove partial non load bearing partition @ kitchen, New cabinets & millwork. No change in use, egress, or occupancy.
Installation of new tru-wall a/c wall unit. Requiring removal of brick exterior wall of the size of 27x16 for sleeve and installation of 5/8x8 flat steel lintel