Plumbing Permit — 5427 FAIRMONT CIR
Plumbing
Not listed
Contact info hidden
Travis County
Work Description
Tunnel under foundation from the outside to repipe cast iron drain lines for 2 full bathrooms. Three access holes will be made on the left side of the home one in the front left side of the home the second one on the left side of the home where hall bathroom is and the third in the back close to the master bathroom total length of tunnel is 45 feet. Kitchen and washer drain line will be rerouted on the right side of the home and ran to the city tap that is located on the front right side of the property. Sewer line will be replaced from the home to the city that is about 60 feet long.
More Plumbing permits in Austin
install gas pipe for generator
*Partial Demo* Interior remodel of condo SFR
ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [3bed 2bath] Work to include: First floor addition new bed new bath [4bed 3bath] and modify driveway t...
New construction of a 2-Story Single Family Res. [4 bed 3.5 bath] with Attached carport
Replacing kitchen sink waste water going around east side 85 feet and tying into main replacing cast iron under front side of house tunneling approximately 8 feet under foundation to vanity 6 feet to...