Renovation Permit — 59 MORTON STREET
Renovation
$209,160
Jrl Skyline Inc
Carlos Saavedra
New York County
Work Description
Proposed interior renovation on cellar, basement, 1t thru 4th floor. Replaced & repainted ceiling, flooring, partition only. On change in layout. No change in use, bulk, egress or occupancy.
Other permits at this address
9 other permits at 59 MORTON STREET. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Proposed enlargement of an existing 4-story building with basement and cellar. excavated in cellar, horizontal extension in bas and 1st fl. convert multi-fam to 1-fam. interior renovation at bas, cel,...
Proposed enlargement of an existing 4-story building with basement and cellar. excavated in cellar, horizontal extension in bas and 1st fl. convert multi-fam to 1-fam. interior renovation at bas, cel,...
A proposed structural filing in conjunction with alt-co job #: m01285183-i1.
A propoed foundation filing in conjunction with alt-co job #: m01285183-i1.
A propoed foundation filing in conjunction with alt-co job #: m01285183-i1.
A proposed structural filing in conjunction with alt-co job #: m01285183-i1.
Submit temporary construction fence work at open space, in conjunction with application job#M01285183, no change in use, egress or occupancy.
Submit temporary construction fence work at open space, in conjunction with application job#M01285183, no change in use, egress or occupancy.
Proposed interior renovation on cellar, basement, 1t thru 4th floor. Replaced & repainted ceiling, flooring, partition only. On change in layout. No change in use, bulk, egress or occupancy.
More Renovation permits in Manhattan
Interior renovation & combination of existing apartments 6a & 6b on the 6th floor, as per with tppn 3/97. work to include partition changes and lighting. no change in use egress or occupancy.
Interior renovation of apt. 10b on the 10th floor. no change to use, egress, or occupancy.
Structural work filed to install new steel lintels, masonry infill and slab repair.
Proposed renovation of primary bathroom at first floor of exist. two story plus cellar condominium unit# 5 as indicated on plans. no changes to exist. use, occupancy, or egress.
Facade repairs as per plans filed. no change in use or egress under this application.