Minor renovation including new finishes and fixtures in two bathrooms. No change in use, occupancy or egress.
Other permits at this address
9 other permits at 61 WEST 62 STREET. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado
Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado
Minor renovation including new finishes and fixtures in two bathrooms. No change in use, occupancy or egress.
Hereby filing to remove and install sprinkler heads with related piping for restaurant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Hereby filing to remove and install plumbing fixtures with related piping for new restaurant as shown on plans filed herewith. No change to use, occupancy or egress.
Hereby filing to remove and install sprinkler heads with related piping for restaurant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Hereby filing to remove and install plumbing fixtures with related piping for new restaurant as shown on plans filed herewith. No change to use, occupancy or egress.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
More Renovation permits in Manhattan
Interior renovation & combination of existing apartments 6a & 6b on the 6th floor, as per with tppn 3/97. work to include partition changes and lighting. no change in use egress or occupancy.
Interior renovation of apt. 10b on the 10th floor. no change to use, egress, or occupancy.
Structural work filed to install new steel lintels, masonry infill and slab repair.
Proposed renovation of primary bathroom at first floor of exist. two story plus cellar condominium unit# 5 as indicated on plans. no changes to exist. use, occupancy, or egress.
Facade repairs as per plans filed. no change in use or egress under this application.