Other Permit — 81 BEAVER STREET
Other
$150,000
G.N.T. MECHANICAL LLC
JOHN TRAVIS STABLER
Kings County
Work Description
StandPipe application
Other permits at this address
10 other permits at 81 BEAVER STREET. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Foundation work filed as per plans
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary plywood fence as per plan. no change in use, egress or occupancy. the plywood fence is beaver street and belvidere street elevations.
Installation of temporary plywood fence as per plan. no change in use, egress or occupancy. the plywood fence is beaver street and belvidere street elevations.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold is to the top of the sidewalk shed at east, west, north (to main roof level), south (from...
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold is to the top of the sidewalk shed at east, west, north (to main roof level), south (from...
Installation of new VERIZON site on the roof. Install 6 antennas, 12 RRH units and 2 GPS antennas and 4 equipment cabinets. Related conduits through 1-4th floor and service connection in the cellar.
Installation of new VERIZON site on the roof. Install 6 antennas, 12 RRH units and 2 GPS antennas and 4 equipment cabinets. Related conduits through 1-4th floor and service connection in the cellar.
Installation of supported scaffolding in accordance with nycc 2022 chapter 33 buliding code. no change in egress, use, or occupancy.
More Other permits in BROOKLYN
Filing for pipe scaffolding installation on behalf of contractor
Filing for temporary fence installation on behalf of contractor
Installation of sprinkler/ standpipe system as per plans.
Ot- remove & install new partitions, doors, ceiling & finishes. install elevator. replaceexisting & install new ada ramp on grade. st- remove portion of exist. floor slabs & beams onfloors 1 thru 3 &...
Propose subsequent filing for new sprinkler system as per plans filed herin, in conjunction with alt-co job # b00780167-i1