Plumbing Permit — 81 BEAVER STREET
Plumbing
$1,999,421
G.N.T. Mechanical Llc
John Travis Stabler
Kings County
Work Description
Application filed for plumbing and sprinkler work in conjunction with alteration-1 321595467.standpipe filed separately under application # b00347086.
Other permits at this address
10 other permits at 81 BEAVER STREET. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Foundation work filed as per plans
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary plywood fence as per plan. no change in use, egress or occupancy. the plywood fence is beaver street and belvidere street elevations.
Installation of temporary plywood fence as per plan. no change in use, egress or occupancy. the plywood fence is beaver street and belvidere street elevations.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold is to the top of the sidewalk shed at east, west, north (to main roof level), south (from...
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold is to the top of the sidewalk shed at east, west, north (to main roof level), south (from...
Installation of new VERIZON site on the roof. Install 6 antennas, 12 RRH units and 2 GPS antennas and 4 equipment cabinets. Related conduits through 1-4th floor and service connection in the cellar.
Installation of new VERIZON site on the roof. Install 6 antennas, 12 RRH units and 2 GPS antennas and 4 equipment cabinets. Related conduits through 1-4th floor and service connection in the cellar.
Installation of supported scaffolding in accordance with nycc 2022 chapter 33 buliding code. no change in egress, use, or occupancy.
More Plumbing permits in Brooklyn
Propose plumbing work only to replace one (1) pvc pipe with cast iron pipe in cellar of existing 3-story building. no work for existing mechanical room, existing gas meters, or electric meters.
Plumbing work filed in conjuction with alt-co as per plans filed herewith.
P.S. 44-K: Modification of Building Plumbing in association to Accessibility project at school and in conjunction with architectural scope of work including new Elevator.
Removal of plumbing work as per plans. No change in use, egress or occupancy (Box Office/Flatbush Entry/Lobby)
Subsequent application filed for plumbing modifications/additions in the cellar and on the 1st floor (stretch lab) as per plans filed herewith. no change in use, egress, or occupancy