Renovation Permit — 90 7TH ST S
Renovation
$75,324
Crawford Merz Llc
90 7th Street South Llc
Hennepin County
Work Description
Interior remodel -ACW certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B 2020 MSBC occupant load: 94 sprinklered: yes Floor(s): 37th floor architect:
Other permits at this address
8 other permits at 90 7TH ST S. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Bldg1169747
HVAC alterations for floors 32-34, include modifying the existing distribution system through the current air handling units, reusing existing and adding new fan-powered and VAV boxes to suit the new...
Demo existing plumbing fixtures and remodel plumbing layout & install (1) Drinking Fountain, (2) Urinals, (5)Lavs/ Faucets, (5) Toilets.
Remodel of 32nd floor common corridor, elevator lobby and restrooms certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC occupant load: 156 spri...
Tenant Improvement - Colliers Mortgage - Floors 32, 33, & 34 certificate of occupancy required: no special inspections required: yes SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING...
Install waste, vent & water for 1 toilet, 1 lav, 1 wellness sink, 4 break room sinks, 2 drinking fountain. Supply water to 2 ice makers, 2 coffee makers, Install 1 dishwasher.
Install waste, vent & water, 1 RPZ, 2 water heaters, 4 break room sinks,1 drinking fountain, 3 glass fillers, 3 dishwashers, 6 toilets, 2 urinals & 6 lavs. All plumbing shall be installed in accordanc...
Provide (3) new FPVAVs. Revise distribution on existing devices. Provide new GRDs per plans. BLDG1156061
More Renovation permits in Minneapolis
Convert Single-Family Dwelling to R-3 Assisted Living Facility CERTIFICATE OF OCCUPANCY REQUIRED - AN AUTHORIZED REPRESENTATIVE OF THE PERMIT APPLICANT MUST CALL 612-673-2327 TO SCHEDULE A CERTIFICATE...
Remodel 1st floor of Rec Center -ACW certificate of occupancy required: no special inspections required: no const type: II-B occupancy: A-3 & B 2020 MSBC occupant load: 130 sprinklered: partial 20% ac...
Replace front entrance and rear entrance exterior doors in existing openings at sfd.
Replace existing front entry stairs with new pt landing and stairs in existing single family house. aaj (project dox plans) ***note: front pt landing with stairs are floating, self supported and unatt...
(DMH-Pdox) REMOVE & REPLACE SHOWER PAN AND TILE SURROUND IN UNIT #14. INSTALL FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS FOR CERAMIC TILE FINISHES AT BATHTUB/SHOWER LOCATIONS. WATER-RESISTANT GYPSUM BAC...