Renovation Permit — 919 THIRD AVENUE
Renovation
$67,960
Structure Tone, Llc
Gary Cappellani
New York County
Work Description
Minor interior renovation including partitions, doors, and finishes on the 34th Floor (Cohen Clair), as per plans. No change to use, egress, or occupancy.
Other permits at this address
10 other permits at 919 THIRD AVENUE. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
55th Street Plaza bulkhead roof replacement, as per plans. No change to use, egress, or occupancy.
Modifications to the existing HVAC system (ATS Room) in the cellar as per plans. No change to use, egress or occupancy.
Main roof replacement and traffic coating, as per plans. Work scope includes guardrail replacement and steel dunnage refurbishment. No change to use, egress, or occupancy.
Modifications to the existing HVAC system (ATS Room) in the cellar as per plans. No change to use, egress or occupancy.
Minor modifications of the existing HVAC system and associated ducts & piping on the 34th Floor (Cohen Clair), as per plans. No change to use, egress, or occupancy.
Minor interior renovation including partitions, doors, and finishes on the 34th Floor (Cohen Clair), as per plans. No change to use, egress, or occupancy.
Minor modifications of the existing HVAC system and associated ducts & piping on the 34th Floor (Cohen Clair), as per plans. No change to use, egress, or occupancy.
Modifications to the existing standpipe system on the 47th Floor, as per plans. No change to use, egress, or occupancy.
Modifications to the existing sprinkler system on the 46th Floor, as per plans. No change to use, egress, or occupancy.
Modifications to the existing standpipe system on the 46th Floor, as per plans. No change to use, egress, or occupancy.
More Renovation permits in Manhattan
Interior renovation & combination of existing apartments 6a & 6b on the 6th floor, as per with tppn 3/97. work to include partition changes and lighting. no change in use egress or occupancy.
Interior renovation of apt. 10b on the 10th floor. no change to use, egress, or occupancy.
Structural work filed to install new steel lintels, masonry infill and slab repair.
Proposed renovation of primary bathroom at first floor of exist. two story plus cellar condominium unit# 5 as indicated on plans. no changes to exist. use, occupancy, or egress.
Facade repairs as per plans filed. no change in use or egress under this application.