HVAC Permits in Manhattan, New York
257 hvac permits filed recently
257 permits
replace existing ducts with new layout on existing existing HVAC system on portion of the 10 floor in conjunction with Alt # M01349165 as per plans filed
Modifying ductwork & supply diffuser to accommodate new partition layout, Demolition of existing AC systems & ductwork .Adding air conditioning units to the 2nd floor to supplement the removed systems...
Installation of new boiler as per plans filed. No change in occupancy, use or egress.
L-4 CARDIOLOGY Phase 4 : HVAC MODIFICATIONS TO ACCOMMODATE THE PHASE 4, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Installation of new hvac systems & ventilations systems along w/ associated ductwork & piping as indicated on the drawings filed herein.
Reach 7 - Temporary relocation of the HVAC system. Once construction of the proposed area is done, HVAC will be restored back to its original location. No change to use, egress or occupancy.
Modifications to the existing HVAC system and associated ducts and piping on the 32nd Floor (EQT), as per plans. No change to use, egress, or occupancy.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
SB 4th Fl:: Modifications of HVAC equipment and ductwork to accommodate alterations within the existing building as per plans filed herewith only.
Proposed installation of air conditioner system as per plan. no change in use, egress or occupancyunder this application.
Modifications to the existing HVAC system on the 14th & 15th floors (Apollo Global Management) as per plans. No change to use, egress or occupancy.
Remove existing boiler and cap pipes. boiler id#10000003194n0001. there is no change of use, egress, or occupancy filed under this plan.
Modification of existing HVAC system on the 32nd Floor (Moroccanoil Office), including the installation of new units, and associated ducts and piping, as per plans. No change to use, egress, or occupa...
Replacement (1) new low pressure boiler. replacement (1) new combination gas/oil burners. change grade of fuel oil from #4 oil to #2 oil. no change in means of egress use group or occupancy.
Modifications to the existing HVAC system on the cellar and 1st floors as per plans. No change to use, egress or occupancy.
Proposed mechanical work associated with the gc job. install ductless mini split air conditioning units. no change to use, occupancy or egress.
Removal of existing 275gal fuel oil tank, installation of a new 275gal fuel oil tank connected to existing emergency generator at shepard hall, and installation of 275gal temporary tank for existing g...
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Modifications to the existing HVAC system on the 6th floor as per plans. No change to use, egress or occupancy.