3,515 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,515 permits
Existing store renovation including removal of millworks, patch, paint, and cleaning of debris on walls, ceiling, and floors. no change in use, egress, or occupancy.
Filing herewith plans for general construction work as shown on plans. there will be no change of use, occupancy or egress under this application.
Minor demolition with installation of new partitions, doors, suspended ceilings, finishes and stair on the 37th and 38th floors (Mirae) as per plans. No change to use, egress or oc…
alterations to existing sprinkler/standpipe systems as per plans filed herewith
Install illuminated led sign (sign 5) on wall structure filed under separate application # m01373574-i1 (changeable copy)
Replacement and repairs of existing foundation drainage system at subcellar level. Existing clay underdrain pipe to be replaced with new 4-inch slotted HDPE pipe and connected to s…
Install illuminated led sign (sign 16) on wall structure filed under separate application # m01373574-i1 (changeable copy)
Connect existing gas piping to replacement gas/oil burner as per plans. no change in use, occupancy or egress.
Modification of an existing HVAC system with re-use of existing components.
Use of Mini Excavator(s) filed in conjunction with job #s M01373547-S1-SE, M01277980-I1-GC, M01277980-S5-ST
Removal and installation of plumbing fixtures and related plunbming piping as shown on drawings. no change to use, egress or occupancy.
plumbing work as shown on plans filed herewith
Erect, maintain & dismantle of scaffold for faade repairs per drawings attached herewith.
Modification of plumbing fixtures in the existing retail space #102 on the 1st floor of exoisting 22-story commercial and office building, use group vi
Install illuminated led sign (sign 6) on wall structure filed under separate application # m01373574-i1 (changeable copy)
Instillation of DRY STANDPIPE System as per plans filed herewith
Interior fit-out. new interior partitions. no demolition. no change in use, egress, or occupancy proposed in this application.
Filing herewith mechanical/hvac scope for offices fit-out at 7th and 8th floors as per plans. No change in use, occupancy, or egress proposed under this application.
Sprinkler work on the 17th and 18th floor (Mamiye) as indicated on drawings.
Facade restoration, inspections