Search Building Permits
2,077 permits · Demolition · NY
Hand demo of existing one story building with cellar and removal of concrete steps to house on the north side of the house.
General Demolition and construction related to the renovation of 6 science rooms.
full demolition of existing one story building.
Full demolition to a one story garage
Demolition of the existing 1 story masonry wall at 2nd floor level. All foundation wall and footings to be removed. 2. New opening in existing masonry wall at entrance 3. Remove and legally dispose of...
full demolition of existing one story building.
Minor interior demolition: Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 7th Floor as per plans (Hines - Demising Wall.) No change to use, egress or occupancy...
Partial demolition to existing 1 story & cellar building; proposed vertical and horizontal enlargement; alteration to meet new building requirements with existing elements to remain. conversion to two...
Minor demolition: Removal of interior partitions, walls, doors, suspended ceilings, flooring and finishes on the 21st Floor as per plans (HighLife - Demo Phase.) No change to use, egress or occupancy.
Proposed horizontal and vertical enlargement, partial demolition, full interior and exterior renovation, and conversion to 2 family.
Demolition of a 2 story house
Full demolition of 3 story mixed use building to comply with NYC HPD Emergency Declaration, DEC# 18912
Partial demolition - removal of rear extension at basement, 1st thru 4th floors of existing bldg. in conjunction with alt type 1 filing #m01208264. no change to use, egress, or occupancy.
Proposed full demolition of a 2-story brick and wood frame building.
Full Demolition of a 2 Story Masonry & Cellar Building
Hand demo of an in-ground pool originally an accessory of 593 foster ave before subdivision of 6/2023
Instalaltion of temporary plywood construction fence for demolition and associated activities for projects per SCA Contract. DOB Job numbers B01245360, B01245412, B0145420, B0124338 and B01254852.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 16th Floor- (Orrick) as per plans. No change to use, egress or occupancy.
Mechanical means submitted for use of mechanical equipment at the time of demolition
Full demolition to a four story building