Search Building Permits
2,106 permits · HVAC · TX
New 1-story single family residence 3 bed/2 bath with attached garage covered porch and patio Green building PUD
Interior Renovation for Apartment Complex-Convert Existing Tubs to Showers. Replace all Existing Counter Tops Cabinets and Fixtures and Equipment with New. Replace all Existing Gypsum Boards with New....
ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. [3bed 2bath] Work to include: Interior remodel new bath [3bed 3bath] New Wood Deck. Revision #1: wood...
Change of use to Personal Improvement Services and Interior renovations including mechanical electrical and plumbing. Minor exterior facade work including paint and parapet extension.
Replacement of furnace only Lennox Furnace Replacement
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
Interior remodel of office space. No additional square footage added to the building. Reconfigure space. New power plumbing and HVAC related to reconfiguration.
interior remodel - bathroom and kitchen will be updated and non support walls will be removed. replace existing doors and windows like for like. electrical and plumbing will be updated and brought to...
Replacement of complete existing central heat and air system with or without duct work Hvac change out
Interior Remodel converting utility room to BR/Utility
Interior remodel of office space. No additional square footage added to the building. Reconfigure space. New power and HVAC related to reconfiguration. No Plumbing
2301 E 2nd St BUILDING 2 (middle rear on E 2nd side): New construction of a 3-Story Single Family Res. [3 bed 3.5bath] and 3rd floor balcony. Part of 4-unit use 8 detached units total in development a...
2303 E 2nd St Building 1: (rearmost on Mildred side): New construction of a 3-Story Single Family Res. [3 bed 3.5bath] with Attached 1-car Garage and 3rd floor balcony. Part of 4-unit use 8 detached u...
New 1-story accessory structure 1 bath
ePlan-Expedited Review: New Construction of Retail Shell Space for Unit B. (5098 SF)
7 DAY Remodel existing admin office
UNIT A: New construction of a 2-Story duplex unit primary dwelling [4bed 4.5bath]
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work change out 3ton airhandler
Replacement of complete existing central heat and air system with or without duct work Downstairs unit - Upflow in closet.