Search Building Permits
3,449 permits · Demolition
1. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. Contract term 60 days from award date. 3. ACHD asbestos application required - Survey...
eplan. EARLY START INTERIOR NON-STRUCTURAL DEMOLITION PERMIT FOR EXISTING RETAIL SPACE.
Temporary construction fence in-conjunction with full demolition and new residential development application. no proposed changed to use, egress or occupancy.
City Funded Demolition 1. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. Contract term 60 days from award date. 3. ACHD asbestos applic...
Interior renovation existing 2 story building. work in cellar, 1st and 2nd floor. demolition work and construction work as per plan. install and repair partition, flooring, ceiling and painting throug...
Full Demolition of Existing one story Building
Removal of sprinker system and conversion of standpipe system to pressurized dry system in assoasition with full building demolition, by others. there is no change to use, egress, or occupancy.
Removal of sprinker system and conversion of standpipe system to pressurized dry system in assoasition with full building demolition, by others. there is no change to use, egress, or occupancy.
Interior demolition in cellar. No change in use, zoning, or egress.
Demo 3 story + basement multifamily building
Demo 3 story + basement multifamily building
Demo 3 story + basement multifamily building
Demo 3 story + basement multifamily building
Demo 3 story + basement multifamily building
Demo 3 story + basement multifamily building
Interior demolition of non structural partition walls, ceiling tiles lighting, fixures and finishes on first floor in existing one story building
General construction interior only demolition and renovation of existing 5 family residential building on floors 001 to 006 and cellar. as per plans filed herewith. no change of use, egress, and occup...
City Funded Demolition 1. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. Contract term 60 days from award date. 3. ACHD asbestos applic...
Interior demolition of partition walls, doors, drop ceiling and light fixtires for future fit out on first floor of existing 2 story building
ePlan: Demo (E) detached Garage