Search Building Permits
3,449 permits · Demolition
Full demolition to a four story building
Application filed to legalize demolition of garage structure
City Funded Demolition 1. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. Contract term 60 days from award date. 3. ACHD asbestos applic...
Demolitiondemo
Demo 3 story + basement multifamily building
Install 8' high temporary plywood construction fence in conjunction with full demolition
ePlan. Demolish existing detached garage to build an ADU
ePlan Demolish existing 4-car detached garage, to be replaced by ADU's.
Demo (e) sfd by handwreck. pedestrian fence and sewer cap required. clear lot.
ePlan. DEMO OF EXISITING SFD AND GARAGE
Demo (e) S.F.D. and det. garage
Removal of sprinker system and conversion of standpipe system to pressurized dry system in assoasition with full building demolition, by others. there is no change to use, egress, or occupancy.
Temporary construction fence in-conjunction with full demolition and new residential development application. no proposed changed to use, egress or occupancy.
eplan. Demolish 12'x6' double faced offsite sign. Double faced sign with 72-sf panels. OSSPIP Case #264040.
Eplan: Demolition of (E) 1-Story SFD w/Attached Carport
Demo (e) detached garage - pedestrian fence required. sewer cap not required
Install 8' high temporary plywood construction fence in conjunction with full demolition
Demolition of (e) detached garage. sewer cap not required.
eplanDEMOLITION OF AN EXISITING ONE STOREY BUILDING 2136 SQ.FT IN SIZE. SEWER CAP AND PEDESTRIANE FENCE IS REQUIRED.
Demolish existing detached garage per plan.