Search Building Permits
2,850 permits · HVAC · NY
NYCHA Boilers: Dyckman: Building 6: General Construction in relation to boiler replacement as per plans filed herewith. No change to use, egress or occupancy.
NYCHA Boilers Dyckman: Building8; General Construction associated with boiler replacement as per plans filed herewith.
Application filed for installation of new plumbing fixtures for the renovation of existing store in conjunction with job # b00945547-i1. also filed for replacing supply lines for the boiler and two ho...
Remove 2 boilers, replace with 2 tankless water heaters. Install 2 new lavatories, 2 new toilets, 2 new shovers, 1 floor drain; relocate 2 toiles, 2 lavatories, 2 shovers, 1 kitchen sink
Renovation of existing cellar, basement, 1st and 2nd floor with plumbing work: relocate kitchen and bathroom fixtures; new 2-pc restroom,washer, dryer, boilers and hot water heaters in cellar; no chan...
Proposed interior renovation of existing store including new counter, new shelves, new slat wall, SS Hood, exhaust duct, exhaust fan, HVAC and refrigeration units.
Boiler application filed herewith in conjunction to alt-co application x01152176-i1
Nycha boilers: dyckman. building 2: plumbing work in relation to boiler replacement as per plans filed herewith.
Renovation of existing cellar, basement, 1st and 2nd floor with plumbing work: relocate kitchen and bathroom fixtures; new 2-pc restroom,washer, dryer, boilers and hot water heaters in cellar; no chan...
NYCHA BOILERS - DYCKMAN; Building 6 Structural work in relation to boiler replacement as per plans filed herewith. Concrete pads, Post installed anchors and support for new Flues and Boilers
Installation of two split air conditioner units in existing deli. no change in use , occupancy or egress under this application.
Remove 2 boilers, replace with 2 tankless water heaters. Install 2 new lavatories, 2 new toilets, 2 new shovers, 1 floor drain; relocate 2 toiles, 2 lavatories, 2 shovers, 1 kitchen sink
Scope of work includes the installation of the following HVAC work. Including using existing unit and Modify the air distribution system for the space. Replacing the existing hot water Radiators. No c...
NYCHA Boilers Dyckman: Building8; General Construction associated with boiler replacement as per plans filed herewith.
NYCHA Boilers: Dyckman: Building 6: General Construction in relation to boiler replacement as per plans filed herewith. No change to use, egress or occupancy.
Proposed interior renovation of existing store including new counter, new shelves, new slat wall, SS Hood, exhaust duct, exhaust fan, HVAC and refrigeration units.
Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy.
Application filed for installation of new plumbing fixtures for the renovation of existing store in conjunction with job # b00945547-i1. also filed for replacing supply lines for the boiler and two ho...
NYCHA BOILERS Dyckman; Building 6: Site/Civil Work in relation to boiler replacement as per plans filed herewith.
NYCHA BOILERS: Dyckman: Building 4. Plumbing work in relation to boiler replacement as per plans filed herewith.