Search Building Permits
2,850 permits · HVAC · NY
Replacement of existing gas water heaters and relocation of existing boilers within existing 3-story residential building due to fire damage. no change or use, egress, or occupancy under this applicat...
Plumbing work on exist. residential house with, install new boiler, h.w.h. as per plan. no change in use, egress or occupancy.
Replacement(registration) of 2 condensing boilers with 1 hr fire enclosure in the 2 apartments on 002 and 003 in the existing 3 story mixed use building. no change in use, occupancy and egress is invo...
Replace boiler and gas/oil burner.
Tenant improvement of existing leased space for a BOH. Work includes non-structural partitions, ceilings, finishes, furniture and related HVAC, electrical and plumbing work. No change to use, egress o...
Register boiler and replace oil burner. register (1) 275 gallon fuel oil tank in cellar.
Mechanical: Modifications to the existing HVAC system on the (23rd Floors- Orrick Buildout) as per plans. No change to use, egress or occupancy.
Register (3) boilers ( boilers,7, 8, 9)
Interior renovation of cellar, basement, 1st & 2nd floor of exist. 2 story building. demolition work and construction work as per plan. install new hvac, partition, flooring, ceiling and painting thro...
Replace boiler and gas/oil burner and change grade of fue oil from #4 to #2.
Installation of one (1) three ton mini-split air conditioning system and associated fan coilunits in apartment 9b. no change to use, egress or occupancy under this application
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 2-pc restroom, washer, dryer,and combined boilers in cellar; no change in use, egress or...
Register (3) gas fired boilers. (boilers 4,5,6)
Replace indirect domestic water heaters and gas connection to replacement boilers.
Install new hvac split system as per plans. no change in use, occupancy or egress
Register two gas fired hot water heaters. gas connection to gas boilers.
Register three gas boilers. (boilers 1, 2, 3)
Propose mechanical modifications at 001 floor existing retail space. To install HVAC system all as per plans herewith filed. No change in egress use or occupancy filed under this application.
Imc 9fl: modification of hvac equipment and ductwork to accommodate alteration to the behavioral healt unit as per plans. no change to use, egress or occupancy
Application filed for boiler installation in the cellar as per plans filed herewith. this application will supersede application # 100485379