Search Building Permits
2,835 permits · HVAC · NY
installation of HVAC systems for partial cellar and 1st floor store.
PLUMBING APPLICATION FILED IN ORDER TO INDICATE CONNECTION OF GAS AND WATER LINES TO REPLACEMENT OF 2 BOILER AT EXISTING PROPERTY, LOCATED IN 2nd FLOOR SPACE
Install new hvac split system as per plans. no change in use, occupancy or egress
Replace existing indoor and outdoor central HVAC system with a new indoor and outdoor split ductless HVAC system, including all associated controls and refrigerant tubing. No change to use, egress or...
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Register (3) gas fired boilers. (boilers 4,5,6)
Replace indirect domestic water heaters and gas connection to replacement boilers.
Installation of one (1) three ton mini-split air conditioning system and associated fan coilunits in apartment 9b. no change to use, egress or occupancy under this application
Installation of new boiler for fourth floor Mezzanine.
Interior renovation of cellar, basement, 1st & 2nd floor of exist. 2 story building. demolition work and construction work as per plan. install new hvac, partition, flooring, ceiling and painting thro...
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 2-pc restroom, washer, dryer,and combined boilers in cellar; no change in use, egress or...
Register two gas fired hot water heaters. gas connection to gas boilers.
Gas connection to three (3) replacement gas boilers.
Installation of new hvac system associated with nb application filed under initial filing
Modifications of the existing HVAC system and associated ducts & piping on the 46th Floor, as per plans. No change to use, egress, or occupancy.
NYCHA Sumner BOILER-BLDG #13- Architectural work being filed for interior repair to existing Mechanical room correspondent to the Sumner BL Houses Project
New 6 low pressure gas line from meter to boilers. new gas trains. no change in means of egress use group or occupancy.
Converting oil fired burner to dual fuel burner to the existing boiler located in the cellar as per plans filed herewith.
Replacement (2) new hot water low pressure boiler. replacement (2) new combination gas/oil burners. no change in means of egress use group or occupancy.
Proposed interior renovation of cellar, 1st & 2nd floor of existing 2 story building. new hvac, construction work as per plan, partition, flooring, ceiling and painting throughout. no change in egress...