Search Building Permits
2,835 permits · HVAC · NY
Interior fit-out of existing residential(floor 1) unit 1g proposed. remove and install non-bearing partitions, install mini-split air conditioning unit. no change of use and occupancy under this appli...
RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH PLUMBING WORK:REPLACE KITCHEN AND BATHROOM FIXTURES; NEW 3-PC BATHROOM iN CELLAR AND 1ST FLOOR; NEW BOILER AND HOT WATER HEATER IN CELLAR; NO CHAN...
Install one mini split hvac unit for heating and cooling. install bathroom exhaust fan. no change to use, occupancy or egress. related gc job #b00954109-i1, related pl job #b00954109-s2, st job #b0095...
Replace three boilers.
Duct work for existing hvac system for medical office on 7th fl as per plans filed herewith. no change to use, egress or occupancy.
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
Interior modifications in suite 1510 (liminal) on the 15th floor. includes removal of select existing ductwork and mechanical components, installation of new hvac distribution and air devices.
New boiler room
Modifications of the existing HVAC system and associated ducts & piping on the 47th Floor, as per plans. No change to use, egress, or occupancy.
Replace two boilers.
Herewith filing boiler work as per plans. no change in use, egress or occupancy
Modifications of the existing HVAC system and associated ducts & piping on the 45th Floor, as per plans. No change to use, egress, or occupancy.
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 2-pc restroom, washer,dryer, boilers and hot water heaters in cellar; no change in use,...
Proposed mechanical, HVAC subsequence to NB
Plumbing application to install plumbing fixtures in a 3 story mixed use buiding. -installation of 1 bfpa as per dep approval(#25103530) on 001. -installation of 1 electric water heater in cellar boil...
Install new boiler and h.w.h. in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
Installation of new hvac system associated with nb application filed under initial filing
Abandon 20,000 gallon fuel oil tank.
File plumbing work to cap/remove oil tank, oil boiler, install new gas boiler, and storage tank as per plan. no change in use, egress or occupancy.
File boiler work to install new gas boiler as per plan. no change in use, egress or occupancy.