Search Building Permits
4,810 permits · New Construction
Remove exterior balcony install new metal railing patch and replace exterior finishes
New construction, addition, GFA change - For the erection of an addition to the side of an existing detached structure. Size and location as shown in plans.
Addition of bathroom and closet on pier and beam foundation at the rear of the existing house add New Carport and permit deck in the rear of structure.
New construction, addition, GFA change - Erection of a two story rear addition to an existing structure to use as three family (3) household living. size and location as shown in the plan.
New construction, addition, GFA change - FOR THE ERECTION OF A 4FT HIGH RETAINING WALL. SIZE AND LOCATION AS SHOWN IN PLANS.
New construction, addition, GFA change - For the erection of an addition to the rear of an existing attached structure. Size and location as shown in plans.
New Construction - FOR THE INSTALLATION OF 478 NEW PENDENT SPRINKLERS TO AN EXISTING FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING TO INCLUDE 4" AMES COLT 200 BACKFLOW PREVENT...
Installation of sprinkler and standpipe for entire building in conjuction with new building application b01003720-i1. no change in use, egress or occupancy.
New construction
Installation of sprinkler and standpipe for entire building in conjuction with new building application b01003720-i1. no change in use, egress or occupancy.
Curb Cut filed in conjunction with NB# B01064827 & B01064827
Construction Fence filed in conjunction with NB Application #X01180882-i1
Application is filed for installation of 9'-0 curb cut along 145 Avenue in conjunction with NB job Q01029349-I1.
Heavy duty sidewalk shed during nb const, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Structural in conjunction with NB application.
nb application for new 1 family house
Installation of multi-point suspended scaffold for worker access during new building construction. multi-point suspended scaffold shall comply with nycc 2022 chapter 33 . no change in egress, use, or...
Northeast pavilion-temporary construction fence in conjunction with construction of a new building within prospect park.
Foundations for a new 42 story reinforced concrete tower. Application filed for structural foundation work only in conjunction with the new building DOBNOW # B00629573
Mechanical specifications in conjunction with nb# x01169510-i1 as per plans filed herewith.